Fairground Road Design and Improvement Cookeville, TN Clinton Engineering served as a Project Manager for civil design of improvements to the existing Fairground Road from South Willow Avenue to South Walnut Avenue in Cookeville, TN. This project consisted of widening the existing road and provided improved storm drainage and sidewalks. Clinton Engineering managed the civil … Continue reading Fairground Road
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed